Post Construction Cleaning in South Florida

Renovation, New Build and Fit-Out Cleaning Scheduled to Your Handover

Clearline Works provides post construction and renovation cleaning for home renovations, condo remodels, new builds and commercial fit-outs across Miami-Dade, Broward, Palm Beach and the Treasure Coast, once the trades are finished.

Quoted flat after a site visit, scheduled to your handover date, with a certificate of insurance where the building or client needs one.

Post-renovation cleaning starts at $250 for a 1-bedroom/1-bath; larger remodels and new builds are quoted flat after a walkthrough or from photos, by scope and square footage. In Miami-Dade and Broward, deep and move-out cleaning start at $220 and post-renovation cleaning at $295. See all prices.

Get a Free Quote

Choose Your Area

Post-construction cleans are quoted after a site visit by the local crew. Pick your city for the page written for it.

Broom Clean vs. Final Clean After Construction

Most construction contracts only require the site to be left broom clean: debris out and floors swept. That standard is usually met. It doesn’t cover dust on surfaces, adhesive, labels, grout haze or anything inside a cabinet.

Broom clean (most contractors)Final clean (Clearline Works)
Large debris removed, floors swept, tools and materials cleared, trash hauled off site.Everything in a broom clean, plus adhesive and label removal, grout haze, paint and caulk splatter, dust out of vents and returns, cabinet and drawer interiors, light fixtures, glass and frames, fixtures polished, every surface wiped and floors cleaned rather than swept.

If your contract says broom clean and nothing more, budget for a final clean separately.

post construction cleaning after a South Florida renovation

What Our Post Construction Cleaning Removes

Adhesive and tape residue from trim, glass, cabinetry and hardware.

Stickers and manufacturer labels from windows, appliances, fixtures and glazing.

Grout haze and thinset film from new tile and stone.

Paint specks, caulk smears and joint compound from floors, glass, hardware and switch plates.

Drywall dust from vents, return grilles, light fixtures, cabinet and drawer interiors, closet corners and the tops of doors and frames.

Surfaces are wiped rather than dry-dusted, top down, with vents done before the final floor pass.

post construction cleaning a renovated kitchen

Phased Cleaning for Larger Projects

New builds and large remodels can be cleaned in phases: a rough clean once drywall and paint are done, a final clean when the trades have left, and a touch-up before the walkthrough or closing.

Each phase is quoted at the site visit, so you know the total before work starts.

removing construction dust in a high-rise unit

When to Book the Final Clean

Wait until every trade has finished and left the site. One carpenter back for half a day can undo a full clean.

Change the HVAC filters and run the system for a day first. Renovation dust sits in the ductwork and settles on finished surfaces the first time the air handler runs.

If your handover date doesn’t allow for that, tell us and we’ll work to the date you have.

final clean after a remodel

Condos, High-Rises and Contractor Work

For condo and high-rise renovations, give us the building name at the quote stage. The certificate of insurance the association asks for is supplied before scheduling, the service elevator is booked for the window the building allows, and work stays inside its vendor hours.

General contractors, renovation firms and property managers book us directly, scheduled to the handover or certificate of occupancy date. Every project is quoted flat after a site visit: call (855) 833-7665 to arrange one.

post construction cleaning a renovated kitchen

Homes After a Remodel: Kitchens, Bathrooms and Floors

A kitchen remodel leaves the most residue in the places you reach for first: inside the new cabinets and drawers, on appliance fronts under their protective film, and in the gap behind the range. We clean cabinet interiors before anything goes back in, peel film and labels, and wipe the inside of the oven and refrigerator that arrived with factory oil and packaging dust.

New bathrooms need grout haze lifted from tile, caulk smears taken off fixtures and glass, and the exhaust fan cleared of drywall dust. New floors, whether tile, vinyl plank or wood, are cleaned to the manufacturer’s care instructions after adhesive spots and protective paper are removed. Interior glass, frames and sills are done last, so the home is ready to move back into rather than merely tidy.

Commercial Fit-Outs, Storefronts and New Offices

Fit-outs are cleaned to a handover or certificate-of-occupancy date, usually in two passes: a rough clean once ceilings, drywall and paint are complete, and a final clean after flooring, millwork and fixtures are in. Ceiling tiles and vents are dusted before floors are touched, glass partitions and storefront glass are cleaned inside and out at ground level, furniture film is removed and workstations wiped, and restrooms and kitchens are cleaned to an opening standard with fixtures polished and labels gone.

Retail floors are cleaned before displays go in, so merchandising is not working around a crew, and a touch-up visit before opening day deals with the dust the final deliveries bring.

Working With Contractors and Site Rules

General contractors and renovation firms book us as the last trade. We follow the site’s access and safety rules, sign in with the superintendent or property manager, and work only once the areas in the scope are released. Large debris removal and dumpsters stay with the contractor; we handle dust, residue, packaging and the small items trades leave behind.

What we need on site is simple: water and power on, HVAC run for a day where possible so airborne dust has settled, and the areas to be cleaned closed to other trades for the cleaning window. If a trade has to return afterwards, a touch-up visit is quoted separately rather than guessed at.

What a Post-Construction Clean Does Not Include

  • Hauling of construction debris, pallets or packaging in bulk.
  • Paint touch-ups, caulking or any repair work.
  • Exterior window cleaning above ground level and pressure washing.
  • Duct cleaning inside the HVAC system; we clean vents and grilles, not the ductwork.
  • Carpet deep cleaning, which can be added through our carpet cleaning page on the same day.

Anything outside the scope is quoted as an add-on before the visit, never added to the invoice afterwards.

Pricing and Scheduling

Every project is quoted flat after a site visit. The price depends on square footage, how many trades worked in the space, the surfaces involved, how much residue is visible, building access and the number of phases. A two-bathroom condo remodel and a 6,000-square-foot office fit-out are different jobs, so there is no price list, but there is a fixed number before work starts.

Book the final clean for the day after the last trade leaves, with a touch-up before the walkthrough if deliveries or punch-list work follow. For condo and high-rise projects, the certificate of insurance and service-elevator booking are handled before the date is confirmed.

Related Services

Homeowners who have remodeled a home they live in can go straight to post-renovation cleaning, which covers timing around painters, pricing and condo or gated-community access.

General contractors and builders: our construction final cleaning page covers rough, final and touch-up cleans, each priced as a flat figure, and the paperwork we send before mobilizing.

Why Owners and Contractors Choose Clearline Works

A handover date doesn’t move because the cleaning company is late. Here’s what you get from us:

post construction cleaning crew

What Our Clients Say

Posted on Google Google
Guido Schwarz profile picture
Guido Schwarz
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Great Job
Posted on Google Google
Kevin Joel profile picture
Kevin Joel
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Just had my apartment cleaned. They showed up on time, were really professional, and did a super thorough job. Everything looks great!
Posted on Google Google
Sharon Martins profile picture
Sharon Martins
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Excellent service, very professional, and great attention to detail. Would definitely recommend!
Posted on Google Google
Von Marie Martinez profile picture
Von Marie Martinez
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
If you are looking for great customer service and a team of cleaners that put attention to detail and care about your needs this is your best bet. Punctuality, caring, great service on the phone and at my house 100% recommended! Definitely using them again!
Posted on Google Google
mr mellimeyl profile picture
mr mellimeyl
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Very clean!
Posted on Google Google
Brian Casey profile picture
Brian Casey
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Very good service first time I use them very happy
Posted on Google Google
Linda Meyers profile picture
Linda Meyers
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Professional and affordable. The team at Clearline works did a fantastic job at my place last week, and the booking process was super easy. They were very accommodating with my requests. 10/10 would recommend!
Posted on Google Google
jake habla profile picture
jake habla
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Great service 5 star
Posted on Google Google
Myla Besara profile picture
Myla Besara
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Reliable and Professional
post construction cleaning in South Florida

Where We Do Post Construction Cleaning

Miami has separate pages for commercial post-construction cleaning and residential post-construction cleaning, and Fort Lauderdale has its own page.

We also clean renovations and fit-outs in Hollywood, Weston, Boca Raton, Delray Beach, West Palm Beach, Jupiter and Stuart.

Related: office cleaning once the space is open, and move-in cleaning.

Guide: post-construction cleaning checklist.

Post Construction Cleaning: Common Questions

How much does post construction cleaning cost?

From $250 for a 1-bedroom/1-bath. Each project is quoted flat after a site visit, based on square footage, the trades involved, surfaces and building access. Two renovations of the same size can leave very different amounts of dust and residue.

No. A deep clean doesn’t include adhesive and label removal, grout haze, or dust inside vents, returns and cabinets. Book one after a renovation and you’ll likely need a second clean a week later.

Contractors usually clean to broom clean standard: debris out and floors swept. That leaves surface dust, adhesive, labels, grout haze and cabinet interiors.

Yes. A rough clean after drywall and paint, a final clean once the trades leave, and a touch-up before the walkthrough or closing, each quoted at the site visit.

Yes. General contractors book us directly, scheduled to each handover or certificate of occupancy date, and several projects can run on one schedule.

Tell us at the site visit. Terrazzo and stone get neutral pH product, wood gets minimal moisture. Refinishing and restoration are separate trades.

Yes. Home renovation cleaning covers drywall dust in vents, cabinets and light fixtures, paint and adhesive residue on glass and trim, and floors cleaned so you can move back in. It’s quoted flat after a site visit.

As soon as the last trade is out, ideally after the HVAC has run for a day so dust has settled. Book the date when you know the handover; we schedule the final clean to it.

Interior glass, frames, tracks and sills, and exterior glass reachable from the ground. Exterior windows above ground level are not included.

Yes. Rough, final and touch-up cleans are quoted separately at the site visit so each phase lands when the project is ready for it.

No. Bulk debris, pallets and dumpsters stay with the contractor. We remove dust, residue, labels, film and the small items trades leave behind.

Water and power on, HVAC running where possible, and the cleaned areas closed to other trades for the cleaning window. Crews bring their own equipment and products.

post construction cleaning questions

Take Cleaning Off Your To-Do List

Spend less time cleaning and more time doing what matters. We handle the work properly so you can relax knowing your project is handed over clean and ready to use.